Karya Imatra GIS Gardu Induk Listrik dening Virkkunen and Co Architects minangka pemenang sing diajeni banget saka A' Design Award Perak 2021 sing bergengsi ing Kategori Kompetisi Desain Arsitektur, Bangunan lan Struktur.
PerakArsitektur· 2021
Imatra GIS Gardu Induk Listrik
dening Virkkunen and Co Architects
Klien: Virkkunen & Co Architects
Pemenang A' Design Award Perak ing Kategori Arsitektur
Pemenang Penghargaan Terverifikasi
Verifikasi Status Penghargaan kanggo #120944Desaine
Babagan Imatra GIS Gardu Induk Listrik
Imatra GIS minangka gardu induk listrik sing dumunung ing bentang alam jeram Imatrankoski ing sisih Wetan Finlandia. Proyek iki nyakup bangunan gardu induk lan limang menara tenaga listrik uga terminal. Bangunan iki nduweni rangka beton lan fasad kulit ganda. Lapisan njaba digawe saka bata dawa gaweyan tangan sing disusun kanthi profil zig-zag lan didhukung dening rangka baja. Struktur transmisi digawe saka profil baja segitiga sing dilas. Desain iki misahake aspek-aspek konteks bangunan sing wis ana lan nyusun maneh elemen-elemen kasebut ing wangun abstrak sing anyar, kanthi seimbang karo bentang alam ing sakupenge.
Pangakuan
Babagan A' Design Award Perak
Imatra GIS Gardu Induk Listrik menang A' Design Award Perak, pangenalan sing prestisius banget sing diparingake marang desain tingkat dhuwur, endah lan nggumunake. Pemenang Perak iku karya sing sumunar banget lan kreatif banget sing nggambarake kaprigelan, bakat lan kaweruh para desainer. Imatra GIS Gardu Induk Listrik dikarepake dadi karya sing nggumunake, conto teladan, profesional banget lan inovatif banget. Desain sing menang A' Design Award Perak iki iku panemuan sing luar biasa banget lan dikagumi sing paring manfaat lan nyurung maju wates seni, sains, desain lan teknologi. Imatra GIS Gardu Induk Listrik iku ciptaan sing akeh sing ngirenake sing nggugah kekarepan, nggawa perasaan positif lan nuwuhake gumun lan kagum.
Ing Mburi Desain
Kit Pers
Kredit, anggota tim lan detail teknis sing diwenehake dening desainer.
- Sifat Unik
- The project is composed of an electricity substation building and an array of five designer power pylons and terminals, set in the national landscape of Imatrankoski rapids in Eastern Finland. The new structures were designed to be in balance with the surrounding landscape. Their design breaks apart aspects of the built context and reassembles them in a new abstracted form. A combination of hand-made and industrial materials and structures is used to achieve this.
- Ukuran & Kemasan
- The substation building floor area: 965 sqm. Length x width x height of the building 44,1 m x 13,2 m x 8,1 m.
- Tag
- infrastructure, architecture, landscape, electricity substation, transmission, power line, brick, concrete, steel
- Teknologi Produksi
- The substation building has a concrete frame and double-skin facades. The outermost facade layer consists of hand-made long bricks laid in a zig-zag profile. The brick cladding is supported by a steel frame fixed to the inner concrete facades. The concrete structure consists of pre-fabricated and in-situ parts. The transmission structures are made of triangular welded steel profiles. They consist of workshop-made, coated pre-fabricated sections assembled and erected on the site without welding.
- Tantangan Desain
- The main challenge was architectural rather than technical, due to the qualities of the surrounding landscape and the history of the area. Visual and structural coherence of the distinct parts and general sensitivity to the context were methods for overcoming this challenge. We arrived at the final design through a process of elimination. Dozens of prototype 3D models were evaluated for impact in a detailed and accurate site model based on an extensive point-cloud data set of the area.
- Riset
- We used site visits and literature sources for determining visual and historical factors that would most influence and serve the design. Literature about the history of the landscape, tourism, architecture, and industry in the area was used. The finding that had the most impact on the design was based on the analysis of the external architecture of the old hydropower plant: the rhythm of the facade openings, and the materials used in the buildings.
- Inspirasi
- The beautiful landscape and the historical significance of the area were the primary sources of inspiration for us. The existing, impressive industrial architecture of the context was another major factor in the design. The guiding principle has been that the new structures should form a clearly defined new historical layer. They would also have to be timeless and combine harmoniously with the context. We sought to further elevate the beauty of the site.
- Durasi Proyek
- Project completed: 2020
Location: Imatra, Finland - Alur Operasi
- Imatra electricity substation and the transmission structures are not fenced off from the surroundings and they can be approached freely. The substation is an unmanned facility that is mainly remote-controlled from a central control room located off-site. It is visited regularly for inspection and maintenance purposes by trained personnel. In the main process equipment room, the users control the switchgear equipment on a workstation designed for this purpose.
- Anggota Tim
- Tuomas Kivinen
Anna Blomqvist
Maria Karjalainen - Kredit Gambar
- Image #1: Photographer Tuomas Kivinen, 2020.
Image #2: Photographer Tuomas Kivinen, 2021.
Image #3: Photographer Tuomas Kivinen, 2020.
Image #4: Photographer Tuomas Kivinen, 2021.
Image #5: Photographer Tuomas Kivinen, 2021.
Disponsori
Jelajahi Ngluwihi Designers.org
Temokake produk, layanan lan kesempatan saka mitra iklan kita.
Jelajahi Liyane
Desain Sing Gegayutan
Jelajahi desain pemenang penghargaan liyane saka kategori sing padha, dipilih miturut kualitas.