Aida Sekkei Precut Fabrica
Cliens: Aida Sekkei Co., Ltd.
Victor praemii Praemium A' Design Award Aureum in Categoria Architectura
Victor Praemii Verificatus
Verifica Statum Praemii pro #160159Designum
De Aida Sekkei Precut Fabrica
Novum consilium fabricae Aida Sekkei praecipue tractat praecisionem lignorum. Conceptus eius totus versatur circa creationem architecturae quae seriem processuum lignorum in se continet. Includit ambulacrum pensile, vitro circumdatum, centum circiter metra longum intra fabricam, designatum ut visitatores totum processum praecisionis de proximo observent. Aedificium officiorum spatia ampla cum compagibus ex materiis marginibus attenuatis confectis praebet, quae communiter ut materia subsidiaria in domibus ligneis adhibentur. Descriptio omnia elementa integrat ad fabricam demonstrativam creandam, visibilitatem ac decorem aestheticum in omni parte praecipue ostendens.
Agnitio
De Praemium A' Design Award Aureum
Aida Sekkei Precut Fabrica victor est Praemii A' Design Award Aureum, honoris amplissimi formis primi ordinis, mirabilibus et praestantibus dati. Victores Aurei sunt opera valde nova, provida et splendida, quae ingenium, sapientiam et peritiam auctorum suorum referunt. Exspectatur Aida Sekkei Precut Fabrica inventum laudatissimum, inclinationes creans et monumentale fore, quod pretium inauditum afferat. Haec forma Aureo praemio victa est incepto mirabile et honoratum, quod fines artis, scientiae, formandi rationis et technologiae promovet. Aida Sekkei Precut Fabrica cupiditatem vehementem excitat, studium accendit, ingenium creandi fovet et capit.
Post Designum
Fasciculus Nuntii
Merita, sodales gregis et singula technica a designatore praebita.
- Proprietates Singulares
- This is a project of a new timber processing plant for precut lumber. Its design concept is all about creating an architecture that embodies the series of timber processing. The almost 100-meter-long viewing aisle encased in a random stripe wooden shell is cantilevered and appears as if it floats from the factory building wall. The aim of the impressive façade design with a sense of acceleration and speed is to provoke the image of Aida Sekkei’s further evolution towards the future.
- Dimensiones et Involucrum
- Site area: 40,023.50 m2
Building area: 14,614.43 m2
Total floor area: 15,206.32 m2
Office Building(2F)
1st floor: 458.21 m2
2nd floor: 429.28 m2
Number of floors: 2 above ground
Height: Maximum height 10.86 m,
Structure: Wooden
Factory Building(2F)
1st floor: 13,886.39 m2
2nd floor: 380.70 m2 - Notulae
- architecture, factory, wooden, truss, pre-cut, Factory tour, Japan
- Technologia Productionis
- As for the office, which is the face of the plant, we created one large space by building a scissor truss using members of smaller cross sections (30 mm by 120mm size lumber used as supplementary members such as wall studs of a home). 120mm square Japanese cypress pillars are placed every 303 mm of the wall and to construct load-bearing walls, a 30 mm thick cedar board was inserted between the pillars.
- Provocatio Designandi
- When constructing large-span wooden structures, it's common to use specialized and expensive materials such as large-diameter engineered lumber. However, here, we've achieved a 12-meter span at low cost by combining small-section studs commonly used in typical residential construction to form trusses. This method, the first of its kind in Japan, utilizes these small-section studs (measuring 30×120mm) which are widely used in residential construction.
- Investigatio
- Research Objective: To find a cost-effective method for achieving large spans in wooden structures. Result: The combination of small-section studs into truss structures has enabled the realization of a 12-meter span at low cost. Impact: There is potential for innovative approaches in medium to large-scale wooden construction.
- Inspiratio
- Before initiating this design, visiting an existing pre-cut factory left a profound impression. Witnessing the precise, aesthetically pleasing fabrication of columns and beams at remarkable speed sparked inspiration. To capture the dynamism and speed of fabrication observed in the factory, the design concept emerged: a facade featuring a protruding massive timber symbolizing the factory's essence.
- Duratio Operis
- This project was completed in September 2020 and is currently in operation. The planned site in Bando City is a place where forest resources are abundant despite being near Tokyo. It is conveniently located as a node of the expressway network in the Tokyo metropolitan area.
- Cursus Operationis
- This is a project of a new timber processing plant for precut lumber designed by Aida Sekkei Co.,Ltd., one of the leading house builders who specializes in traditional Japanese timber construction.
- Patentes
- None
- Agnitiones Imaginum
- Image #1-#5: Photographer Nobuaki Miyashita, Variations, 2020
Patrocinatum
Explora Ultra Designers.org
Inveni producta, servitia et occasiones a sociis nostris publicitariis.
Plura Exploranda
Designa Cognata
Explora plura designa praemio ornata ex eadem categoria, merito selecta.