Dizayini ya Aida Sekkei Precut Fakitale ndi Nobuaki Miyashita ndi wopambana wotamandika kwambiri pa mphotho yaulemu ya 2024 Mphoto ya Golide ya A' Design Award mu Gawo la Mpikisano la Mapangidwe a Nyumba, Zomanga ndi Zomangidwa.
GolideZomangamanga· 2024
Aida Sekkei Precut Fakitale
Kasitomala: Aida Sekkei Co., Ltd.
Wopambana pa Mphoto ya Golide ya A' Design Award mu Gawo la Zomangamanga
Wopambana Wotsimikizidwa
Tsimikizani Mkhalidwe wa Mphotho ya #160159Kapangidwe
Za Aida Sekkei Precut Fakitale
Dongosolo la fakitale yatsopano ya Aida Sekkei limayang'ana pa kudula matabwa m'chipindacho. Lingaliro lake ndilofuna kupanga nyumba yomangidwa yomwe ikuwonetsa njira zonse za kukonza matabwa. Ikhala ndi njira yoyendera yowuluka, yotsekedwa ndi galasi ya mamita pafupifupi 100 kutalika mkati mwa fakitaleyo, yopangidwa kuti alendo aone bwino njira yonse ya kudula matabwa. Nyumba ya ofesi ili ndi malo aakulu okhala ndi zolimbitsa denga zopangidwa kuchokera ku zinthu za m'mbali za nthiti, zomwe zimagwiritsidwa ntchito ngati zinthu zowonjezera m'nyumba zamatabwa. Kapangidwe kake kaphatikiza zinthu zonse kuti apange fakitale yoonetsera, yotsindika kuwoneka bwino ndi kukongola m'mbali zonse.
Chidziwitso
Za Mphoto ya Golide ya A' Design Award
Aida Sekkei Precut Fakitale ndi mmodzi mwa opambana a Mphoto ya Golide ya A' Design Award, kuzindikirika kolemekezeka kwambiri komwe kumaperekedwa kwa mapangidwe a pamwamba, odabwitsa ndi odziwika. Opambana a Golide ndi zolengedwa zatsopano kwambiri, zoona patali ndi zonyezimira zomwe zimaonetsa luntha, nzeru ndi luso la opanga awo. Aida Sekkei Precut Fakitale akuyembekezeka kukhala chopangidwa chotamandidwa kwambiri, chokhazikitsa zochitika ndi chachikulu chomwe chimabweretsa phindu losawonekapo kale. Mapangidwe opambana Mphoto ya Golide ya A' Design Award awa ndi ntchito yodabwitsa, yolemekezeka yomwe imapindulitsa kwambiri ndi kukulitsa malire a luso, sayansi, kapangidwe ndi ukadaulo. Aida Sekkei Precut Fakitale amabweretsa zilakolako zamphamvu, kudzutsa chidwi, kulimbikitsa luso lolenga ndi kutikopa.
Kumbuyo kwa Kapangidwe
Katundu wa Atolankhani
Umboni, mamembala a gulu ndi zambiri zapadera zoperekedwa ndi wopanga.
- Makhalidwe Apadera
- This is a project of a new timber processing plant for precut lumber. Its design concept is all about creating an architecture that embodies the series of timber processing. The almost 100-meter-long viewing aisle encased in a random stripe wooden shell is cantilevered and appears as if it floats from the factory building wall. The aim of the impressive façade design with a sense of acceleration and speed is to provoke the image of Aida Sekkei’s further evolution towards the future.
- Miyezo ndi Kuphimba
- Site area: 40,023.50 m2
Building area: 14,614.43 m2
Total floor area: 15,206.32 m2
Office Building(2F)
1st floor: 458.21 m2
2nd floor: 429.28 m2
Number of floors: 2 above ground
Height: Maximum height 10.86 m,
Structure: Wooden
Factory Building(2F)
1st floor: 13,886.39 m2
2nd floor: 380.70 m2 - Zizindikiro
- architecture, factory, wooden, truss, pre-cut, Factory tour, Japan
- Teknoloji Yopangira
- As for the office, which is the face of the plant, we created one large space by building a scissor truss using members of smaller cross sections (30 mm by 120mm size lumber used as supplementary members such as wall studs of a home). 120mm square Japanese cypress pillars are placed every 303 mm of the wall and to construct load-bearing walls, a 30 mm thick cedar board was inserted between the pillars.
- Vuto la Dizayini
- When constructing large-span wooden structures, it's common to use specialized and expensive materials such as large-diameter engineered lumber. However, here, we've achieved a 12-meter span at low cost by combining small-section studs commonly used in typical residential construction to form trusses. This method, the first of its kind in Japan, utilizes these small-section studs (measuring 30×120mm) which are widely used in residential construction.
- Kafukufuku
- Research Objective: To find a cost-effective method for achieving large spans in wooden structures. Result: The combination of small-section studs into truss structures has enabled the realization of a 12-meter span at low cost. Impact: There is potential for innovative approaches in medium to large-scale wooden construction.
- Chilimbikitso
- Before initiating this design, visiting an existing pre-cut factory left a profound impression. Witnessing the precise, aesthetically pleasing fabrication of columns and beams at remarkable speed sparked inspiration. To capture the dynamism and speed of fabrication observed in the factory, the design concept emerged: a facade featuring a protruding massive timber symbolizing the factory's essence.
- Nthawi ya Polojekiti
- This project was completed in September 2020 and is currently in operation. The planned site in Bando City is a place where forest resources are abundant despite being near Tokyo. It is conveniently located as a node of the expressway network in the Tokyo metropolitan area.
- Mdondomeko ya Ntchito
- This is a project of a new timber processing plant for precut lumber designed by Aida Sekkei Co.,Ltd., one of the leading house builders who specializes in traditional Japanese timber construction.
- Petensi
- None
- Mwini Zithunzi
- Image #1-#5: Photographer Nobuaki Miyashita, Variations, 2020
Zolipidwa
Fufuzani Kupitilira Designers.org
Onani zinthu, ntchito ndi mwayi kuchokera kwa ogulitsa athu aulaliki.
Zina Zofufuza
Mapangidwe Ofanana
Fufuzani mapangidwe ena opambana mphotho ochokera mu gulu lomweli, osankhidwa malinga ndi ukadaulo.