Istanbul Rail System Station ᱢᱮᱴᱨᱚ ᱥᱴᱮᱥᱚᱱ ᱵᱟᱵᱚᱛ ᱛᱮ
ᱤᱥᱛᱟᱸᱵᱩᱞ ᱨᱮᱞ ᱥᱤᱥᱴᱮᱢ ᱰᱤᱡᱟᱭᱤᱱ ᱥᱟᱨᱵᱷᱤᱥ-ᱯᱷᱮᱡᱽ ᱑ ᱫᱚ ᱵᱟᱨᱭᱟ ᱥᱟᱹᱥᱟᱹᱝ ᱛᱟᱞᱢᱟ, ᱱᱮᱥᱱᱟᱞ ᱜᱟᱨᱰᱮᱱ ᱟᱨ ᱤᱥᱛᱟᱸᱵᱩᱞ ᱨᱮᱭᱟᱜ ᱵᱮᱞᱜᱽᱨᱮᱰ ᱵᱤᱨ ᱠᱚ ᱡᱚᱲᱟᱣ ᱮᱫᱟᱭ᱾ ᱱᱚᱶᱟ ᱞᱟᱭᱤᱱ ᱫᱚ ᱢᱤᱫ ᱡᱤᱞᱤᱧ ᱥᱟᱹᱥᱟᱹᱝ ᱜᱷᱟᱹᱴᱤ ᱞᱮᱠᱟ ᱰᱤᱡᱟᱭᱤᱱ ᱟᱠᱟᱱᱟ ᱡᱟᱦᱟᱸ ᱫᱚ ᱵᱟᱨᱭᱟ ᱥᱟᱹᱥᱟᱹᱝ ᱛᱟᱞᱢᱟ ᱠᱚ ᱡᱚᱲᱟᱣ ᱮᱫᱟᱭ᱾ ᱱᱚᱶᱟ ᱰᱤᱡᱟᱭᱤᱱ ᱫᱚ ᱵᱟᱭᱚᱯᱷᱤᱞᱤᱠ ᱟᱨ ᱴᱤᱠᱟᱹᱣ ᱟᱨᱠᱤᱴᱮᱠᱪᱚᱨ ᱨᱮᱭᱟᱜ ᱯᱟᱨᱟᱢᱤᱴᱚᱨ ᱠᱚ ᱥᱮᱞᱮᱫ ᱟᱠᱟᱫᱟᱭ᱾ ᱵᱟᱦᱮᱨ ᱥᱟᱶ ᱧᱮᱞ ᱡᱚᱲᱟᱣ, ᱥᱚᱡᱷᱮ ᱢᱟᱨᱥᱟᱞ ᱟᱨ ᱦᱚᱭ ᱫᱟᱜᱟᱹᱣ ᱫᱚ ᱥᱠᱟᱭᱤᱞᱟᱭᱤᱴ ᱛᱮ ᱪᱷᱟᱹᱰᱤ ᱮᱢ ᱦᱩᱭᱩᱜ-ᱟ, ᱟᱨ ᱥᱟᱹᱥᱟᱹᱝ ᱨᱟᱹᱯᱩᱫ ᱫᱚ ᱥᱴᱮᱥᱚᱱ ᱨᱮᱭᱟᱜ ᱦᱚᱭ ᱥᱟᱯᱷᱟ ᱨᱮ ᱜᱚᱲᱚ ᱮᱢᱟᱭ᱾ ᱢᱤᱫ ᱢᱩᱬ ᱠᱷᱩᱸᱴᱤ ᱡᱟᱦᱟᱸ ᱫᱚ ᱫᱟᱨᱮ ᱨᱩᱯ ᱠᱚ ᱛᱮᱭᱟᱨ ᱟᱠᱟᱫᱟᱭ, ᱫᱩᱨᱩᱥ ᱥᱟᱶᱛᱮ ᱫᱚᱦᱚ ᱟᱠᱟᱱᱟ ᱢᱤᱫ ᱡᱚᱨ ᱡᱟᱜᱟ ᱛᱮᱭᱟᱨ ᱞᱟᱹᱜᱤᱫ ᱡᱟᱦᱟᱸᱨᱮ ᱦᱚᱲ ᱠᱚ ᱛᱤᱝᱜᱩ ᱫᱟᱲᱮᱭᱟᱜ-ᱟ᱾
ᱢᱟᱱᱟᱱ
A' Design Award ᱞᱚᱦᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱵᱟᱵᱚᱛ ᱛᱮ
Istanbul Rail System Station ᱢᱮᱴᱨᱚ ᱥᱴᱮᱥᱚᱱ ᱫᱚ A' Design Award ᱞᱚᱦᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱧᱟᱢ ᱟᱠᱟᱱᱟ, ᱱᱚᱶᱟ ᱫᱚ ᱵᱷᱟᱞᱟᱭ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ ᱞᱟᱹᱜᱤᱫ ᱮᱢ ᱟᱠᱟᱱ ᱥᱚᱢᱟᱱ ᱠᱟᱱᱟ᱾ ᱱᱚᱶᱟ ᱠᱚ ᱫᱚ ᱰᱤᱡᱟᱭᱤᱱᱟᱨ ᱠᱚ ᱨᱮᱭᱟᱜ ᱵᱷᱟᱵᱱᱟ ᱟᱨ ᱵᱷᱟᱞᱟᱭ ᱠᱟᱢᱤ ᱡᱷᱟᱞᱠᱟᱣ ᱠᱚ᱾ Istanbul Rail System Station ᱢᱮᱴᱨᱚ ᱥᱴᱮᱥᱚᱱ ᱫᱚ ᱠᱚᱞᱟ, ᱣᱤᱜᱭᱟᱱ, ᱰᱤᱡᱟᱭᱤᱱ ᱟᱨ ᱴᱮᱠᱱᱚᱞᱚᱡᱤ ᱨᱮᱭᱟᱜ ᱥᱤᱢᱟ ᱵᱟᱲᱦᱟᱣ ᱟᱨ ᱫᱩᱱᱤᱭᱟ ᱵᱷᱟᱞᱟᱭ ᱞᱟᱹᱜᱤᱫ ᱜᱚᱲᱚ ᱮᱢ ᱠᱟᱱᱟ᱾
ᱰᱤᱡᱟᱭᱤᱱ ᱯᱤᱪᱷᱟ ᱨᱮ
ᱯᱨᱮᱥ ᱠᱤᱴ
ᱰᱤᱡᱟᱭᱤᱱᱟᱨ ᱧᱮᱞ ᱠᱷᱚᱱ ᱠᱨᱮᱰᱤᱴ, ᱴᱤᱢ ᱥᱫᱚᱥᱭ ᱟᱨ ᱴᱮᱠᱱᱤᱠᱮᱞ ᱵᱤᱵᱚᱨᱚᱬ ᱮᱢ ᱟᱠᱟᱱᱟ᱾
- ᱟᱞᱜᱟ ᱜᱩᱱ ᱠᱚ
- The design incorporates parameters of biophilic and sustainable architecture. Visual connection with nature is provided through the skylight and the green wall, which generate fresh air. Windows on the skylight have sensors measuring the quality of the indoor air. The skylight allows diffused daylight to enter the station.The Pv panels on the skylight produce sustainable energy for use in the station. Biomorphic forms are abstracted when designing the column. Epd certified materials are selected.
- ᱢᱟᱯ ᱟᱨ ᱯᱮᱠᱮᱡᱤᱝ
- It is aimed that the Phase 1 Metro Line to provide fast access between Sefakoy and Basaksehir on the European side of Istanbul. The line will also be joined with existing metro lines within the city. It is planned that there will be 11 stations with a total length of 16 km. The platform length of the stations is 50 mt.
- ᱴᱮᱜ ᱠᱚ
- Metro, Underground Station, Sustainability, Biophilic Design, Bim, Vr, Structural Column Design, Istanbul
- ᱛᱮᱭᱟᱨ ᱛᱮᱠᱱᱚᱞᱚᱡᱤ
- Bim allowed the integration of 10 disciplines including Architecture, Hvac, Plumbing, Electrical, Signalization, Infrastructure, Tunneling, Routing. Virtual reality and other visualization technologies allow easy revising and coordination. Vr tools in Revit were utilized to make architectural decisions such as, height of ceiling, placement of artworks, form and details of the suspended ceiling etc.
- ᱰᱤᱡᱟᱭᱱ ᱪᱮᱞᱮᱧ
- Model coordination and the skylight design were the main challenges faced in the project. The skylight is essential to provide daylight and is designed for seven specific stations on the Phase 1 metro line. The skylight is large and designing it requires input from mechanical, electrical, static and architectural groups. 10+ different disciplines worked on the same model using the BIM and all electrical, mechanical, static and aesthetic decisions were made in the same model.
- ᱜᱚᱵᱮᱥᱚᱱᱟ
- Metro stations are boisterous places where thousands of people interact with each other every day. Allowing the connection between underground stations and the environment is main target of the project. With biophilic architecture, visual connection with nature, dynamic and diffuse lighting, material connection with nature, thermal & airflow variability, biomorphic forms and patterns are provided with skylight, green wall and Epd certified products and designed patterns of the floors and the walls.
- ᱯᱨᱮᱨᱚᱱᱟ
- Istanbul Rail System -Phase 1 metro line connects two green cores, the National Garden and the Belgrade Forests in Istanbul. The line is designed in a way that imitates a long green valley connecting the two green cores of the area. The design process aims to provide the parameters of biophilic and sustainable architecture. The station, designed with inspiration from nature, aims to reflect the images of nature.
- ᱯᱨᱚᱡᱮᱠᱴ ᱥᱚᱢᱚᱭ
- The project is on the Istanbul Rail System Design Services-Phase 1 in Istanbul. The consultancy services are performed by Yuksel Proje. The design work of the project was started in Yuksel Proje headquarters located in Ankara on November 2018. The design phase was completed in three months thanks to the efficiency of Bim implamentations. The client is the Istanbul Metropolitan Municipality.
- ᱠᱟᱹᱢᱤ ᱦᱚᱨ
- Natural light and ventilation systems are used to maximize the comfort of passengers. Pedestrian simulations are examined to ensure optimum passenger flow. Basic specifications related to the passenger circulation in metro stations are considered. Functional solutions, such as entry-exit orientations, turnstile settlements, and ticket machine locations are analyzed. The salient column is carefully placed to create an emphasis point where crowds can linger. The walls which the passengers interact the most according to the pedestrian simulation are designed as a green wall and an exhibition wall for art panels.
- ᱯᱮᱴᱮᱱᱴ ᱠᱚ
- Registered Design. 2019 06983. Yuksel Proje Uluslararası A.S. 2019. National
Registered Design. 2019 06986. Yuksel Proje Uluslararası A.S. 2019. National - ᱴᱤᱢ ᱥᱮᱫᱟᱭ ᱠᱚ
- Lead Designer: Tugce Bakirel
Design Team:Bahadırcan Yurdakul
Burcu Avanoglu
Gulsun Ecem Durukan
Project Architect: Can Akansel - ᱪᱤᱛᱟᱹᱨ ᱥᱟᱹᱦᱟ
- Image #1: Render Tugce Bakirel, YP-1-Station_Concourse, 2019.
Image #2: Render Tugce Bakirel, YP-2-Station_Section, 2019.
Image #3: Render Tugce Bakirel, YP-3-Station_Concourse, 2019.
Image #4: Render Tugce Bakirel, YP-4-Station_Concourse, 2019.
Image #5: Render Tugce Bakirel, YP-5-Station_Concourse, 2019.
ᱥᱯᱚᱱᱥᱚᱨᱰ
Designers.org ᱠᱷᱚᱱ ᱯᱟᱨᱚᱢ ᱛᱟᱞᱟᱥ
ᱟᱞᱮᱭᱟᱜ ᱵᱤᱜᱽᱭᱟᱯᱚᱱ ᱥᱟᱹᱜᱟᱹᱭ ᱠᱚ ᱠᱷᱚᱱ ᱯᱨᱚᱰᱟᱠᱴ, ᱥᱮᱵᱟ ᱟᱨ ᱢᱚᱠᱟ ᱩᱫᱩᱜ ᱢᱮ᱾
ᱟᱨᱦᱚᱸ ᱠᱷᱚᱡ ᱢᱮ
ᱥᱟᱹᱜᱟᱹᱭ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ
ᱢᱤᱫ ᱞᱮᱠᱟ ᱠᱮᱴᱮᱜᱚᱨᱤ ᱠᱷᱚᱱ ᱟᱨᱦᱚᱸ ᱯᱩᱨᱥᱠᱟᱨ ᱧᱟᱢᱟᱠᱟᱱ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ ᱧᱮᱞ ᱢᱮ, ᱡᱚᱜᱭᱟᱛᱟ ᱧᱮᱞ ᱛᱮ ᱵᱟᱪᱷᱟᱣ ᱟᱠᱟᱱᱟ᱾