Uyilo olubizwa ngokuba yi-Hours on the Slope IFektri, IBhilidingi yeeOfisi olwenziwe ngu-T.E and C Architects Associates ngumwini obekekileyo webhaso elinobukhazikhazi le-2021 Ibhaso Lebhronzi le-A' Design Award Kudidi Lokhuphiswano lwe-Uyilo lweZakhiwo, Isakhiwo kunye neMilo.
IbhronziUyilo lweZakhiwo· 2021
Hours on the Slope IFektri, IBhilidingi yeeOfisi
ngu T.E and C Architects Associates
Umxhasi: T.E and C Architects Associates
Umwini we-Ibhaso Lebhronzi le-A' Design Award Kudidi Lwe-Uyilo lweZakhiwo
Umwini Webhaso Oqinisekisiweyo
Qinisekisa Isimo Sebhaso se-#106869Uyilo
Malunga ne-Hours on the Slope IFektri, IBhilidingi yeeOfisi
I-Hours on the Slope yindawo yefektri needolophu yeeofisi eTaichung, eTaiwan. Indawo yahlulwe yaba ziindlu ezintathu ezicwangciswe ngokuphendula kwimeko yendalo nakwicala apho zijolise khona. Ngasecaleni lasentshona, apho ukuvezwa kwelanga kuphezulu, iifestile ezimnyama kunye nokuncitshiswa komda weefestile kugxininisa uvakalelo lobungakanani. I-Granite kunye nenkqubo yokugquma amaso ezakhiwo eziluhlaza kwezimbo zisibekele iindonga zangaphandle. Imosaic yelitye lendalo yakhethelwa umphezulu ojikelezayo webhilidingi yeeofisi. Inkqubo yombhobho ongcwatyiweyo ikhokelela umoya obandayo wangaphandle ukuya ngaphakathi kwiplanti, kwaye iipanel zelanga eziphezu kophahla zinika umthunzi kwindawo yokupaka iimoto kwiflowa esiphezulu.
Ukuqatshelwa
Malunga ne-Ibhaso Lebhronzi le-A' Design Award
Hours on the Slope IFektri, IBhilidingi yeeOfisi ngumphumeleli weIbhaso Lebhronzi le-A' Design Award, ukuqatshelwa okuhlonitshwayo kakhulu okunikwa imiyilo ephawulekayo eyahlukaniswa kukuyila, ubukrelekrele nobukrelekrele. Abaphumeleleyo beBhronzi ziimveliso ezinobuchule obukhulu nezidala ngokumangalisayo ezingqina amava aphangaleleyo, ukucinga nokwazi ukuzenzela kwabayili bazo. Hours on the Slope IFektri, IBhilidingi yeeOfisi iyathenjwa ukuba ibe yimpahla exatyiswa kakhulu, edunyiswayo nethandwayo enobungcali obuphawulekayo nezinto ezintsha. Lo myilo uphumeleleyo weIbhaso Lebhronzi le-A' Design Award ubandakanya iindlela ezilungileyo kakhulu kubugcisa, inzululwazi, uyilo kunye nobuchwephesha kwaye ugqwesile ngenxa yokunikela ingqalelo kwiinkcukacha. Hours on the Slope IFektri, IBhilidingi yeeOfisi iyanelisa iimfuno ngokumangalisayo, ichukumisa iinqwenelo, ikhwebela iimvakalelo kwaye itsala umdla.
Emva Koyilo
Ikhithi Yeendaba
Iziqinisekiso, amalungu eqela kunye neenkcukacha zobugcisa ezinikezelwe ngumyili.
- Iimpawu Ezizodwa
- The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
- Imilinganiselo nePakishini
- The project is 63767 square meter.
- Iithegi
- Architecture, Factory, Office, Plant, Building
- Ubuchwepheshe Bokuvelisa
- The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
- Umngeni Woyilo
- This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
- Uphando
- A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
- Inkuthazo
- The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
- Ubude Beprojekthi
- The project finished in December 2018 in Taichung, Taiwan.
- Ukuhamba Komsebenzi
- The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
- Amalungu Eqela
- Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang - Amagunya Emifanekiso
- Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.
Okuxhasiweyo
Hlola Ngaphaya kwe-Designers.org
Fumana iimveliso, iinkonzo kunye namathuba avela kumaqabane ethu entengiso.
Okungakumbi Ongakuphonononga
Oyilo Ezinxulumeneyo
Phonononga ezinye izinto zoyilo eziwongwe ngembasa kweli candelo linye, ezikhethwe ngokwemfanelo.