Fò lọ sí àkóónú
Kwsa Ògiri Onígbésẹ̀ láti ọwọ́ Leva Engineering

Kwsa Ògiri Onígbésẹ̀ láti ọwọ́ Leva Engineering jẹ́ aṣẹ́gun olókìkí púpọ̀ ti 2025 Àmì-ẹ̀yẹ Fàdákà A' Design Award nínú Ẹ̀ka Ìdíje Àpẹẹrẹ Ìgbékalẹ̀ Ìbáṣepọ̀, Ìrírí àti Ìbòmọ́lẹ̀.


FàdákàÌgbékalẹ̀· 2025

Kwsa Ògiri Onígbésẹ̀

látọ̀wọ́ Leva Engineering

Oníbàárà: Leva Engineering

Aṣẹ́gun Àmì-ẹ̀yẹ Fàdákà A' Design Award nínú Ẹ̀ka Ìgbékalẹ̀

30,958

Aṣẹ́gun Àmì Ẹ̀yẹ Tí a Jẹ́rìísí

Jẹ́rìísí Ipò Àmì Ẹ̀yẹ fún #172468

Àwọ̀

Àpẹrẹ Náà

Nípa Kwsa Ògiri Onígbésẹ̀

Kwsa jẹ́ iṣẹ́ ìfisọ́lẹ̀ ògiri onígbésẹ̀ tí ó wà ní Ilé-iṣẹ́ Ìmọ̀-tuntun Aramco ní Riyadh. Iṣẹ́ náà bo àyè mítà onígun mẹ́rin 209, ó sì jẹ́ dídá láti ara ògiri mọ́dúlà mẹ́fà, tí ọ̀kọ̀ọ̀kan wọn fẹ̀ tó 6000 mm, ó sì ga tó 7000 mm. Ìgbésẹ̀ rẹ̀ ń wáyé nípasẹ̀ àwọn mọ́tò onípele 20,000 tí ń darí ètò skurú aṣíwájú àti lefà tí a ṣe ní pàtàkì pẹ̀lú ìpéye 0.1 mm. Àwọn ẹ̀yà ara tí a fi teknopólímà tí ń fi ara rẹ̀ ṣe ọ̀rá ṣe kò nílò ọ̀rá kankan, wọ́n sì gba àyè wíwọlé láti iwájú fún ìtọ́jú. Àwọn ìtòlẹ́sẹẹsẹ ìjó-ìgbésẹ̀ ni a ń dá láti ara fídíò aláwọ̀ eérú, níbi tí àwọn iye ìmọ́lẹ̀ ti ń ṣàlàyé ìwọ̀n ìgbésẹ̀ náà.

Ìdánimọ̀ Náà

Nípa Àmì-ẹ̀yẹ Fàdákà A' Design Award

Kwsa Ògiri Onígbésẹ̀ jẹ́ olùborí Àmì-ẹ̀yẹ Fàdákà A' Design Award, ìdánimọ̀ onípọ̀nlé lọ́nà àrà ọ̀tọ̀ tí a fún àwọn àwòṣe ìpele gíga jùlọ tó dára tó sì ń kan ọkàn. Àwọn olùborí Fàdákà jẹ́ àwọn iṣẹ́ tó ń tàn yòò gidigidi tó sì ní ìṣẹ̀dá púpọ̀ tí wọ́n ń ṣàfihàn ìmọ̀ ìjìnlẹ̀, ẹ̀bùn àti ìmọ̀ràn àwọn olùṣàwòṣe wọn. A retí pé Kwsa Ògiri Onígbésẹ̀ yóò jẹ́ iṣẹ́ àgbàyanu, àpẹẹrẹ rere, ti ọ̀jáfáfá lọ́nà tó ṣe pàtàkì tó sì ní ìmúṣẹ̀dá tuntun jinlẹ̀. Àwòṣe tó borí Àmì-ẹ̀yẹ Fàdákà A' Design Award yìí jẹ́ ohun ìmúṣẹ̀dá tó hàn gbangba gidigidi tí a mọrírì tó ń ṣe anfàní tó sì ń tì ààlà iṣẹ́ ọnà, sáyẹ́ǹsì, àwòṣe àti ìmọ̀-ẹ̀rọ síwájú. Kwsa Ògiri Onígbésẹ̀ jẹ́ ẹ̀dá tí ọ̀pọ̀lọpọ̀ ń ṣe ìlara, tó ń jí ìfẹ́ inú, tó ń mú ìmọ̀lára rere wá tó sì ń jí ìyàlẹ́nu àti ìyanu.

Lẹ́yìn Àpẹrẹ Náà

Àkójọ Ìròyìn

Àwọn ẹ̀tọ́, àwọn ọmọ ẹgbẹ́ àti àlàyé ìmọ̀ ẹ̀rọ tí olùṣàpẹrẹ pèsè.

Àwọn Ohun Àkànṣe
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Ìwọ̀n àti Àpò
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Àwọn Àkọlé
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Ìmọ̀-ẹ̀rọ Ìṣelọ́pọ̀
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Ìpèníjà Àpèsè
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Ìwádìí
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Ìmísí
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Àkókò Iṣẹ́ Àkànṣe
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Ìlànà Ìṣiṣẹ́
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
Àwọn Ọmọ Ẹgbẹ́
Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology

Oníṣọwọ́

Ṣàwárí Ju Designers.org Lọ

Ṣàwárí àwọn ọjà, iṣẹ́ àti àǹfààní láti ọ̀dọ̀ àwọn alábàáṣe ìpolówó wa.

Àpèsè Dídára Tọ́sí Ìmọ̀yìn Ńlá

A' Design Award jẹ́ àmì ẹ̀yẹ àgbáyé tí àwọn onídàjọ́ ń fúnni fún àpèsè dídára. Kópa nínú A' Design Award láti ní àǹfààní láti gba ìmọ̀yìn tí o tọ́sí, gba òkìkí, ọlá àti ìpolówó fún iṣẹ́ rẹ. Yan iṣẹ́ rẹ fún A' Design Award kí o sì dije fún ẹ̀bùn A' Design Prize tó gbajúmọ̀.

Yan