设计师 DAP Yapı 的作品 Ormankoy Community Centre 社区中心 荣获了极具声望的 2021 A' Design Award 铂金奖,竞赛类别为建筑与结构设计。
铂金建筑· 2021
Ormankoy Community Centre 社区中心
设计师: DAP Yapı
客户: DAP Yapı
建筑类别A' Design Award 铂金奖获奖者
已验证的获奖者
验证 #119997 的获奖状态设计作品
关于 Ormankoy Community Centre 社区中心
奥尔曼柯伊社区中心是一座位于土耳其伊斯坦布尔的公共建筑。木质外壳塑造了社区中心的独特气质,而大面积玻璃幕墙则将室内空间向周围的森林敞开。钢框架结构塑造出建筑的鲜明造型,并支承于跨度超过18米、横跨泳池空间的混凝土梁之上。两处位于不同标高的生态池塘覆盖面积达4000平方米,设计中避免使用刺激性化学药剂,以保护野生动物与宠物。木质饰面将随时间推移而改变色泽与肌理,一如森林的四季更替。
荣誉认可
关于A' Design Award 铂金奖
Ormankoy Community Centre 社区中心是 A' Design Award 铂金奖得主,这是授予真正卓越、优雅和宏伟设计的极具声望的认可。铂金奖得主是创造的奇迹,是智力创造力极限的见证,展现出其设计师无与伦比的专业精神和天才。这些设计被期待成为定义一个时代的美学、造福社会、并拓展艺术、科学、设计和技术边界的最负盛名的作品。Ormankoy Community Centre 社区中心展现出超凡脱俗的卓越水准,以其有益而宝贵的特质毫无疑问地让世界变得更美好。Ormankoy Community Centre 社区中心是一件赢得 A' Design Award 铂金奖的作品,它唤起欲望,启发人心,令人愉悦,并迸发出巨大的喜悦。
设计幕后
媒体资料包
由设计师提供的致谢、团队成员及技术详情。
- 独特属性
- Wooden shell forms the building's characteristics. Wide glazed façades expand the indoor spaces to nature.
Within the project area there are 2 ponds in different levels. Water quality of both ponds intended to be potable water. The use of hard chemicals has been avoided to ensure the safety of the guest's pets as well as the surrounding wildlife.
Wooden claddings which is expected to change its colour and texture in time - as seen in the seasonal changes of the forest- are used both in indoor and outdoor façades. - 标签
- Nature, park, biological, pond, architecture, design, wildlife, community, non-profit, istanbul
- 生产技术
- Steel frame structure is what gives the unique shape of the building. From ground to 3rd basement levels, steel structure sits on concrete beams which spans over 18 meters above pool space.
- 灵感
- Design is an abstraction of surrounding natural environment.
It's aimed to establish an intersection between Ormankoy Community Centre and the surrounded natural park with addition of biological pond which is 4000 sqm in size.
Compared to the natural park level, project building is located on the peak of the land which gives the opportunity of both to see and comprehend the natural park better and also to be seen and comprehended at the same time. - 项目周期
- Design phase started in December 2019 and construction completed in 2020 June in Istanbul, Turkiye
- 操作流程
- Public, Non-Profit
- 团队成员
- Mustafa Kemal Kayış
Seray Öztürk
Murat Saçlıoğlu
Fatih Aşçı
赞助内容
探索 Designers.org 之外
发现来自我们广告合作伙伴的产品、服务和机会。
探索更多
相关设计
探索同类别中更多按优秀程度甄选的获奖设计。