设计师 Uds Ltd. 的作品 Komazawa Daigaku 火车站 荣获了极具声望的 2026 A' Design Award 银奖,竞赛类别为建筑与结构设计。
银建筑· 2026
Komazawa Daigaku 火车站
设计师: Uds Ltd.
客户: UDS Ltd.
建筑类别A' Design Award 银奖获奖者
已验证的获奖者
验证 #173965 的获奖状态设计作品
关于 Komazawa Daigaku 火车站
驹泽大学站是位于东京世田谷区驹泽公园地下的一座改造后的铁路车站。"公园之下"的设计理念将地下大厅视为树根,而将出入口建筑视为象征性的树木。车站各构成元素依三种时间尺度进行归类:永久性的土木结构、随岁月生长的树木,以及不断更新的枝叶。原有的瓷砖与水磨石地面得以保留,以减少废弃物,同时采用了国产木材。金属质感的顶棚涂层营造出树影斑驳的光影效果。长凳与吧台则邀请人们在此休憩与相遇。
荣誉认可
关于A' Design Award 银奖
Komazawa Daigaku 火车站是 A' Design Award 银奖得主,这是授予顶级、华美而令人印象深刻的设计的极为崇高的认可。银奖得主是极其卓越、极具创造力的作品,展现出其设计师杰出的专业技能、才华与敏锐。预计Komazawa Daigaku 火车站将成为一件出色的典范之作,兼具非凡的专业性与深刻的创新性。这件赢得 A' Design Award 银奖的设计是一项备受瞩目、令人钦佩的发明,造福并拓展艺术、科学、设计和技术的边界。Komazawa Daigaku 火车站是一件令人羡慕的创作,它唤起渴望,带来积极的情感,并激发惊叹与赞叹。
设计幕后
媒体资料包
由设计师提供的致谢、团队成员及技术详情。
- 独特属性
- This project's uniqueness is its "Under the Park" concept, which creates a consistent narrative for the entire space: the underground concourse is envisioned as the town's "roots," and the buildings as "symbolic trees." Furthermore, a unique design methodology redefines the station via three timescales: "permanent earthworks," "aging Trees," and "renewing leaves." This presents a new vision for an adaptable station designed to be loved long-term.
- 尺寸与包装
- Total Floor Area:
Underground Station Concourse: Approx. 6,500 sqm (RC structure, 2 floors below ground)
East Exit Building: 564.34 sqm (RC structure, 4 stories above ground)
West Exit Building 1: 398.58 sqm (Steel structure, 2 stories above ground)
West Exit Building 2: 346.80 sqm (Timber and partial RC structure, 4 stories above ground, 2 floors below ground) - 标签
- Renovation, Station, Sustainability, Timber, AdaptiveReuse, Narrative, PublicSpace, Biophilic, Placemaking, Tokyo
- 生产技术
- This project’s realization is driven by sustainability. We minimized waste by preserving existing tiles and terrazzo floors, while using domestic timber for its warmth and environmental benefits. The West Exit building, in a fire protection district, pioneers advanced timber tech like LVL fire-resistant coating and a two-way rigid-frame structure (rare in Japan). A special metallic ceiling coating creates a unique komorebi (dappled sunlight) effect.
- 设计挑战
- Our greatest challenge was maintaining the consistency of the "Under the Park" concept across a four-year project with diverse work areas and many stakeholders. Amidst fragmented on-site decisions, our "Earthworks, Trees, and Leaves" design guideline served as the core guiding principle to return to. Additionally, realizing a timber station building in a fire protection district was a major external challenge, requiring us to overcome strict legal regulations and technical constraints.
- 研究
- This practical research aimed to translate the given "Under the Park" concept into a sustainable space, creating new value for aging infrastructure. Our methodology was to develop the "Earthworks, Trees, and Leaves" model, which classifies station components by three timescales. Based on this model, we selected materials and composed the space, prototyping advanced timber technology in one building. The expected social impact is increased user dwell time, fostering affection for the station.
- 灵感
- The primary source of inspiration for this project is its very location: "under Komazawa Park." We were strongly motivated by the desire to transform the aging, inorganic underground space—a place people have used daily for over 45 years—into a more comfortable and cherished environment. Therefore, we placed the "park," a quintessential landscape shared by all local residents, at the core of our concept. We envisioned that just as the trees in the park extend their roots underground to support their lush forms above, the station could also become like a living organism—absorbing, nurturing, and radiating the town's vitality. This poetic vision of "Under the Park" became the driving force behind the entire design.
- 项目周期
- This project was implemented at Komazawa-daigaku Station in Setagaya, Tokyo, as the first phase of the "Green Under Ground" renewal project by Tokyu Railways Co., Ltd. The schematic design phase began in August 2020, and the overall construction period for the station runs from July 2020 to March 2025. Completion is on April 1, 2025.
- 操作流程
- Visitors are guided by the "Symbolic Tree"-like station buildings into the "Under the Park" world. Descending warm, trunk-like staircases, a space unfolds resembling the roots of a park, seemingly bathed in dappled sunlight. This functions not merely as a path to the trains, but as a "garden" for people to spend time as they wish. Intentionally placed benches and counters invite users to linger, meet or rest, generating a new, personal interaction with the station itself.
- 团队成员
- Designer: Keiichi Ito
Designer: Yayoi Sato
Designer: Seshiro Honda
Graphic Designer: Yutaro Sakurai - 图片版权
- Image #1 : TOKYU CONSTRUCTION CO., LTD., 2025
Optional Image #1 : Photographer Shinsui Ohara, 2025
Optional Image #2 : Photographer Shinsui Ohara, 2025
Optional Image #3 : Photographer Shinsui Ohara, 2025
Optional Image #4 : Photographer Shinsui Ohara, 2025
Optional Image #5 : Photographer Shinsui Ohara, 2025
赞助内容
探索 Designers.org 之外
发现来自我们广告合作伙伴的产品、服务和机会。
探索更多
相关设计
探索同类别中更多按优秀程度甄选的获奖设计。