跳至内容
Créa Inc Design 的作品 Britannia 海上风力发电机

设计师 Créa Inc Design 的作品 Britannia 海上风力发电机 荣获了极具声望的 2019 A' Design Award 铁奖,竞赛类别为能源产品、项目与设备设计。


铁能源· 2019

Britannia 海上风力发电机

设计师: Créa Inc Design

客户: Créa Inc Design Ltd.

能源类别A' Design Award 铁奖获奖者

32,856

已验证的获奖者

验证 #70235 的获奖状态

色彩

设计作品

关于 Britannia 海上风力发电机

Britannia(不列颠尼亚)是一款专为英国海上风电场设计的超大型海上风力发电机。该风机发电功率达10兆瓦,足以满足7,500户家庭的瞬时用电需求。整体结构高达180米,叶片扫掠直径为145米。外部面板采用玻璃纤维复合材料制成,安装于内部钢梁结构之上。散热器为大型发电机组降温,其布局使进气口得以成为造型设计元素。内部空间经过精心规划,使运维人员在检修期间能够在机舱内工作与休息。

荣誉认可

关于A' Design Award 铁奖

Britannia 海上风力发电机是 A' Design Award 铁奖得主,这是授予满足人们对设计精良的创作所期待的专业与工业要求的优良设计的声望认可。铁奖得主展现出其创作者的高超技艺、高度专业化、专家级的理解力和创造能力。预计Britannia 海上风力发电机将成为一件备受推崇、令人钦佩且被珍爱的创作,既实用又创新。这件赢得 A' Design Award 铁奖的设计整合了行业最佳实践,并拥有与专业知识和才华相结合的称职技术特性。Britannia 海上风力发电机因其严谨而受到尊重,旨在提供有助于让世界变得更美好的生活品质改善。

设计幕后

媒体资料包

由设计师提供的致谢、团队成员及技术详情。

独特属性
The Britannia is mega-scale wind turbine proposed for offshore wind farms in the United Kingdom, the largest in the world and first to produce 10Mw of power. The exterior styling differentiates Clipper turbines and is designed to evoke company heritage and inspiration. Placement of the radiators to cooling the large generators, allowed the use of air scoops as stylistic elements. The interior architecture is optimized for people to work and sleep inside the large space to service the generators.
尺寸与包装
It generates 10Mw of energy, electricity for instantaneous demand of 7,500 homes at once.

Height 180m
Bladespan145m

Generators replaced by lower/raising from ships with built in crane & moved internally to position.

Crew delivered to roof helipad & can sleep onboard. Doors/windows added for comfort.

External panels made from fibreglass composite mounted to internal i-beam structure. Blades made from single composite molding. Fabricated in road transportable modules because of large size.
标签
Wind Turbine, Energy, Generator, Brittannia, Clipper Windpower, Offshore, Green Power, Renewable Energy
生产技术
Engineering teams developed generators, gearing, blades, & steel structure. It was starting point for exterior design & interior crew architecture. Turbine generator cooling is important (many catch fire) and placement of radiators was carefully considered for impact. Crew required internal space for removing, servicing, & replacing large generators. Windows, walkways, and sleep areas were positioned for crew comfort. Bomb-bay doors located for ship access. Helipad access on roof was planned.
设计挑战
The hardest part of the engineering challenge was working with such a large scale product - engineering requirements were extreme including fabrication, assembly, mechanics, etc... all affecting the industrial design options.
研究
Some people dislike look & noise of wind turbines, while suppliers want more efficiency/turbine. We solve these problems w/ mega-scale & design.

Mega turbines produce more power, reducing number. Big size increases friction & heat, so radiators are essential. Scale allows internal cranes, bomb-bay doors, & habitability. Modular construction facilitates assembly.

ID aim was to increase beauty w/ efficient engineering solutions – to create an iconic shape in sky, representing Clipper & renewable power.
灵感
Brittania has stylistic inspiration from the nautical heritage of Clipper, the Clipper ship itself, and is expressed in the galley like rear end forms as well as the streamlined shape. CEO/Founder Jim Dehlson, “the father of modern Windpower,” expressed his aspiration for Britannia was the sculpture of “Winged Victory of Samothrace.” The exterior was designed to embody elements such as the arched wings, to create a mega sized inspirational sculpture. Function is integrated throughout the form, including the placement of Radiators to create the galley form and walkway under the Wing forms.
项目周期
The project started in December 2008, in Santa Barbara California (USA), San Francisco (USA), and Bristol (UK). The industrial design phase of the project was completed in March 2010.
操作流程
Britannia is built in modular pieces & transported via highways/ ships to assembly site – each w/ challenges because of scale.

On site, the tower would be built then modular parts are hoisted into place. 1st internal frame, then exterior pieces. Internal cranes lift generators & radiators into place. The cone would be added, then blades installed.

During use, generators could be dismantled internally or replaced with bomb-bay doors. Technicians could arrive via helipad or lifted from ships.
团队成员
Project Lead: Jim Dehlson
Program Manager: Anthony Chobot
Engineering Lead: Erik Smith
Brand Manager: Steven Fischer
Industrial Design: Travis Baldwin
图片版权
Industrial Designer Travis Baldwin, Britannia Visuals, 2010.
Illustration Clipper Windpower, Product Paintings, 2010-2011.

赞助内容

探索 Designers.org 之外

发现来自我们广告合作伙伴的产品、服务和机会。

优秀设计值得卓越认可

A' 设计奖是一项国际性的专业评审荣誉,旨在表彰优秀设计。参加 A' 设计奖,获得凭实力赢得认可的机会,为您的作品赢得声誉、荣耀和曝光。提名您的作品参加 A' 设计奖,角逐令人瞩目的 A' 设计大奖。

立即提名