Spring na inhoud
Kwsa Kinetiese Muur deur Leva Engineering

Die ontwerp Kwsa Kinetiese Muur deur Leva Engineering is 'n hoogs gewaardeerde wenner van die baie prestigieuese 2025 A' Design Award in Silwer in die Installasie-ontwerp-kompetisiekategorie.


SilwerInstallasie· 2025

Kwsa Kinetiese Muur

deur Leva Engineering

Kliënt: Leva Engineering

Wenner van die A' Design Award in Silwer in die Installasie-kategorie

30,958

Geverifieerde Toekenningswenner

Verifieer Toekenningsstatus vir #172468

Kleure

Die Ontwerp

Oor Kwsa Kinetiese Muur

Kwsa is 'n kinetiese muurinstallasie geleë by die Aramco Innovasiesentrum in Riaad. Die werk beslaan 209 vierkante meter en word gevorm deur ses modulêre mure, elk 6000 mm breed en 7000 mm hoog. Beweging word voortgebring deur 20 000 stappermotors wat 'n pasgemaakte loodskroef- en hefboomstelsel met 'n presisie van 0,1 mm aandryf. Komponente vervaardig van selfsmerende tegnopolimere benodig geen smering nie en maak toegang van voor moontlik vir instandhouding. Gechoreografeerde sekwense word geskep uit grysskaalvideo, waar helderheidswaardes die mate van beweging bepaal.

Die Erkenning

Oor die A' Design Award in Silwer

Kwsa Kinetiese Muur is 'n wenner van die A' Design Award in Silwer, 'n buitengewoon prestigieuse erkenning wat toegeken word aan topklas-, pragtige en indrukwekkende ontwerpe. Wenners in Silwer is geweldig briljante en uiters kreatiewe werke wat die uitstaande kundigheid, talent en skerpsinnigheid van hul ontwerpers illustreer. Daar word verwag dat Kwsa Kinetiese Muur 'n wonderlike vertoonstuk is wat merkwaardig professioneel en diepgaande innoverend is. Hierdie ontwerp wat die A' Design Award in Silwer gewen het, is 'n hoogs noemenswaardige, bewonderde uitvinding wat die grense van kuns, wetenskap, ontwerp en tegnologie bevoordeel en uitbrei. Kwsa Kinetiese Muur is 'n wyd beny skepping wat begeertes oproep, positiewe gevoelens bring en verbasing en verwondering wek.

Agter die Ontwerp

Persstel

Krediete, spanlede en tegniese besonderhede verskaf deur die ontwerper.

Unieke Eienskappe
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Afmetings & Verpakking
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Etikette
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Produksietegnologie
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Ontwerpuitdaging
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Navorsing
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspirasie
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Projekduur
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Bedryfsvloei
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
Spanlede
Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology

Geborg

Verken Verder as Designers.org

Ontdek produkte, dienste en geleenthede van ons advertensiavennote.

Goeie Ontwerp Verdien Groot Erkenning

Die A' Design Award is 'n internasionale, beoordeelde bekroning vir goeie ontwerp. Neem deel aan die A' Design Award om die geleentheid te kry om meriete-erkenning te verdien, roem, aansien en publisiteit vir jou werk te verwerf. Nomineer jou werk vir die A' Design Award en ding mee vir die begeerde A' Design Prize.

Nomineer