Kwsa Aɣrab Yettembiwilen sɣur Leva Engineering d anerbaz yettwaqadren meqqren n 2025 Tarbaḥt A' Design Award n Lfeṭṭa deg Taggayt n Tnaflit n Afeṣṣel n Usbeddi.
LfeṭṭaAsbeddi· 2025
Kwsa Aɣrab Yettembiwilen
sɣur Leva Engineering
Amsaɣ: Leva Engineering
Anerbaz n Tarbaḥt A' Design Award n Lfeṭṭa deg Taggayt n Asbeddi
Anerbaz n Urraz Yettwasenqden
Senqed Addad n Urraz i #172468Afeṣṣel
Ɣef Kwsa Aɣrab Yettembiwilen
Kwsa d asbeddi n uɣrab yettembiwilen yellan deg Wammas n Usnulfu n Aramco di Riyadh. Axeddim-a yeṭṭef 209 n lmitrat imerbaɛen, yebna s sḍis n leḥyuḍ imefruzen, yal yiwen deg-sen tehri-s 6000 mm, teɣzi-s d asawen 7000 mm. Tummla d-tekk seg 20.000 n imutuṛen n usurif i yesseddayen anagraw uslig n uqadus yettezzin d tqeffalt s tseddi n 0,1 mm. Iferdisen yettwaxedmen s teknupulimeṛen i yesserwaten iman-nsen ur ḥwaǧen ara asirew, yerna ttaǧǧan anekcum si zdat i usemḥadder. Igzumen yettwahegган n umussu ttwaxelqen-d seg tvidyut s yiniten igriwen, anda azal n tafat yesbadu aswir n umussu.
Asmekti
Ɣef Tarbaḥt A' Design Award n Lfeṭṭa
Kwsa Aɣrab Yettembiwilen d amerbaḥ n Tarbaḥt A' Design Award n Lfeṭṭa, tagmat ɛlayen i yisnulfa yelhan, yeḥlan s waṭas. Imerbaḥen n Lfeṭṭa d isnulfa yelhan akk, yesɛan tmusni d tazmert. Kwsa Aɣrab Yettembiwilen ad yili d asnulfu amaynut, yelhan, ad yeǧǧ ddunit tennuɣ.
Deffir n ufeṣṣel
Tagrurt n tɣamsa
Ismawen n terbaɛt, iferdisen itiknikanen akked telɣut i d-yefka umeṣṣufeɣ.
- Taɣara Tasuft
- Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
- Tigejdiwin & Akemmus
- Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required. - Tibzimin
- Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
- Tasnakta n Ufares
- The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
- Asewḥel n Usnulfu
- A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
- Anadi
- This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
- Aseḥbiber
- The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
- Tanzagt n Usenfar
- The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024. - Tanila n Umahil
- The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
- Igmamen n Terbaɛt
- Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology
Yettwaxellṣen
Snirem Seld Designers.org
Af-d iferdisen, imeẓla d tegnatin sɣur yimɛawnen-nneɣ n usissen.
Ugar i tifin
Ifeṣṣelen yemcudden
Snirem ugar n ifeṣṣelen yewwin ammud seg twennaḍt-nni kan, ttwaferzent s lmeɛna.