MHS Building Systems Apẹrẹ Fireemu Aluminiomu Igbekale láti ọwọ́ Tim Siahatgar jẹ́ aṣẹ́gun olókìkí púpọ̀ ti 2023 Àmì-ẹ̀yẹ Irin A' Design Award nínú Ẹ̀ka Ìdíje Àpẹẹrẹ Ohun-èlò Ìkọ́lé àti Ẹ̀ka Ìmọ́lé.
IrinẸ̀ka Ìkọ́lé· 2023
MHS Building Systems Apẹrẹ Fireemu Aluminiomu Igbekale
látọ̀wọ́ Tim Siahatgar
Oníbàárà: MHS Building Systems
Aṣẹ́gun Àmì-ẹ̀yẹ Irin A' Design Award nínú Ẹ̀ka Ẹ̀ka Ìkọ́lé
Aṣẹ́gun Àmì Ẹ̀yẹ Tí a Jẹ́rìísí
Jẹ́rìísí Ipò Àmì Ẹ̀yẹ fún #148543Àpẹrẹ Náà
Nípa MHS Building Systems Apẹrẹ Fireemu Aluminiomu Igbekale
MHS Building Systems, apẹrẹ, itọsi, ati idagbasoke nipasẹ Tim M. Siahatgar, ẹya Architectural Engineer be ni Irvine, California, ni o wa lagbara sibẹsibẹ lightweight Aluminiomu Construction Systems. Wọn funni ni ojutu pipe lati pade awọn ibeere ẹda ti awọn iṣẹ akanṣe apọjuwọn alailẹgbẹ, pese awọn aye ailopin. Awọn apẹẹrẹ ati awọn olugbaisese ṣe ifọwọsowọpọ lati ṣafipamọ awọn iṣẹ akanṣe alagbero nipa lilo MHS Structural Aluminum Framing ati awọn eto paneli. Ọna ifọwọsi yii ti ikole prefab modular ngbanilaaye fun ikole ti fere eyikeyi apẹrẹ ayaworan, boya o jẹ ibugbe
Ìdánimọ̀ Náà
Nípa Àmì-ẹ̀yẹ Irin A' Design Award
MHS Building Systems Apẹrẹ Fireemu Aluminiomu Igbekale jẹ́ olùborí Àmì-ẹ̀yẹ Irin A' Design Award, ìdánimọ̀ olókìkí tí a fún àwọn àwòṣe tó dára tí wọ́n pàdé àwọn ohun tí iṣẹ́ àti ilé-iṣẹ́ nílò tí a retí láti ọ̀dọ̀ àwọn ẹ̀dá tí a ṣàwòṣe dáradára. Àwọn olùborí Irin ń fi ìjáfáfá ńlá, ìmọ̀ pàtó gíga, òye ògbóǹtarìgì àti agbára ìṣẹ̀dá àwọn olùṣẹ̀dá wọn hàn. A retí pé MHS Building Systems Apẹrẹ Fireemu Aluminiomu Igbekale yóò jẹ́ ẹ̀dá tí a kà sí gidigidi, tí a gbóríyìn fún tí a sì nífẹ̀ẹ́, tó wúlò tó sì ní ìmúṣẹ̀dá tuntun. Àwòṣe tó borí Àmì-ẹ̀yẹ Irin A' Design Award yìí ń kó àwọn ọ̀nà tó dára jùlọ ilé-iṣẹ́ jọ, ó sì ní àwọn ànímọ́ ìmọ̀-ẹ̀rọ tó péye tí a so mọ́ ìmọ̀ ṣíṣe àti ẹ̀bùn. A bọ̀wọ̀ fún MHS Building Systems Apẹrẹ Fireemu Aluminiomu Igbekale nítorí ìfọ̀kànbalẹ̀ rẹ̀, a sì ṣàwòṣe rẹ̀ láti pèsè ìmúdára ìgbésí ayé tó ń ran ayé lọ́wọ́ láti di ibi tó dára jù.
Lẹ́yìn Àpẹrẹ Náà
Àkójọ Ìròyìn
Àwọn ẹ̀tọ́, àwọn ọmọ ẹgbẹ́ àti àlàyé ìmọ̀ ẹ̀rọ tí olùṣàpẹrẹ pèsè.
- Àwọn Ohun Àkànṣe
- MHS Building Systems, designed, patented, and developed by Architectural Engineer. A strong, yet lightweight, Aluminum Construction System, it's the perfect solution to meet the creative demands of modular unique projects, with endless possibilities, designers & contractors work together, to deliver sustainable prefabricated projects using MHS Structural Aluminum Framing and paneling systems. Almost any architectural residential and commercial buildings design up to 3 stories can be built with this certified method of modular prefab construction.
- Ìwọ̀n àti Àpò
- The MHS Prefab Aluminum Post and Beam Framing can remain exposed to the interior and exterior of the building or covered with any enclosure building systems based on the architectural design. The Size of MHS-170 extrusion section is 170 mm x 170 mm.
- Àwọn Àkọlé
- #prefab #modulardesign #sustainable #aluminumstructure #building #prefabricated #adu #architecture #modern #mhs #designbuild #structure #modularhome
- Ìmọ̀-ẹ̀rọ Ìṣelọ́pọ̀
- Research and Evaluation Report: LARR: 25703 (CSI # 06 12 00)
Department of Building and Safety – Los Angeles, CA, USA
General Building Codes Approval with Technical Modification for use of MHS building systems at Seismic Design categories A-F (LARR 25703) https://www.ladbsservices2.lacity.org/ResearchReport/reports/25703 - Ìpèníjà Àpèsè
- The unique simplicity and flexibility of this structure truly allows it to sit lightly on land and adapt to the nature of its environment as an optimal example of sustainability.
- Ìwádìí
- After many years study and research start designing and manufacturing the actual structural extrusions and interlocking clamp by design. Next step to start testing the framing sections, wall and roof diaphragm at a professional certified laboratory in Los Angeles for many years based on California and international building codes. The testing result analyses and calculated by expert Structural Engineers to make sure the MHS structures meeting the Seismic Design categories A-F.
- Ìmísí
- With my many years of research, knowledge and experience in the design and building industries, I was able to come up with an invention of durable interlocking connectors and the design of extrusion sections programming to create a unique Structural Aluminum Framing for architectural modular prefab design.
- Àkókò Iṣẹ́ Àkànṣe
- MHS's designer, inventor office located in Irvine, California,
Fabricator licensee: Los Angeles, Sacramento and Long Beach - Àwọn Ìwé-ẹ̀rí Ohun-Ìmọ̀
- Tim holds a USA and China patents (200610127616.0) of his invention. Modular aluminum systems with interlocking mechanism for prefab housing aluminum construction that used in conjunction with both EPS sandwich panel assembly and conventional materials for building industry.
- Ìfọwọ́sí Àwòrán
- All system development, products and materials protected under international and U.S. Patent, China Patent and Copyright Law.
© Tim M. Siahatgar, Architectural engineer is the original inventor of MHS Building Systems, Structural Aluminum Framing design.
Oníṣọwọ́
Ṣàwárí Ju Designers.org Lọ
Ṣàwárí àwọn ọjà, iṣẹ́ àti àǹfààní láti ọ̀dọ̀ àwọn alábàáṣe ìpolówó wa.
Díẹ̀ Síi Láti Ṣàwárí
Àwọn Àpẹrẹ Tó Jọra
Ṣàwárí àwọn àpẹrẹ mìíràn tó gba àmì ẹ̀yẹ nínú ẹ̀ka kan náà, tí a yàn nípasẹ̀ ìyege.