Leva Engineering ᱨᱮᱱᱟᱜ Kwsa ᱠᱟᱤᱱᱮᱴᱤᱠ ᱠᱟᱸᱛᱷ ᱫᱚ ᱥᱚᱛᱷᱟᱯᱚᱱ ᱰᱤᱡᱟᱭᱤᱱ ᱯᱨᱚᱛᱤᱡᱚᱜᱤᱛᱟ ᱵᱷᱟᱜ ᱨᱮ 2025 A' Design Award ᱨᱩᱯᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱨᱮᱱᱟᱜ ᱟᱹᱰᱤ ᱢᱟᱱ ᱟᱠᱟᱱ ᱡᱤᱛᱠᱟᱨ ᱠᱟᱱᱟ᱾
ᱨᱩᱯᱟᱥᱚᱛᱷᱟᱯᱚᱱ· 2025
Kwsa ᱠᱟᱤᱱᱮᱴᱤᱠ ᱠᱟᱸᱛᱷ
Leva Engineering ᱞᱮᱠᱟᱛᱮ
ᱜᱟᱦᱟᱠ: Leva Engineering
ᱥᱚᱛᱷᱟᱯᱚᱱ ᱵᱷᱟᱜ ᱨᱮ A' Design Award ᱨᱩᱯᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱡᱤᱛᱠᱟᱨ
ᱡᱟᱸᱪ ᱟᱠᱟᱱ ᱮᱣᱟᱨᱰ ᱡᱤᱛᱠᱟᱨ
#172468 ᱞᱟᱜᱤᱫ ᱮᱣᱟᱨᱰ ᱦᱟᱞᱚᱛ ᱡᱟᱸᱪᱰᱤᱡᱟᱭᱤᱱ
Kwsa ᱠᱟᱤᱱᱮᱴᱤᱠ ᱠᱟᱸᱛᱷ ᱵᱟᱵᱚᱛ ᱛᱮ
ᱠᱣᱥᱟ ᱫᱚ ᱢᱤᱫ ᱠᱟᱤᱱᱮᱴᱤᱠ ᱠᱟᱸᱛᱷ ᱤᱱᱥᱴᱚᱞᱮᱥᱚᱱ ᱠᱟᱱᱟ ᱚᱠᱟ ᱫᱚ ᱨᱤᱭᱟᱫᱽ ᱨᱮᱱᱟᱜ ᱟᱨᱟᱢᱠᱚ ᱤᱱᱚᱵᱷᱮᱥᱚᱱ ᱥᱮᱱᱴᱟᱨ ᱨᱮ ᱢᱮᱱᱟᱜᱼᱟ ᱾ ᱱᱚᱶᱟ ᱠᱟᱹᱢᱤ ᱫᱚ ᱒᱐᱙ ᱵᱚᱨᱜᱚ ᱢᱤᱴᱟᱨ ᱡᱟᱭᱜᱟ ᱮ ᱛᱚᱯᱟᱜ ᱟᱠᱟᱫᱟ ᱟᱨ ᱛᱩᱨᱩᱭ ᱜᱚᱴᱟᱝ ᱢᱚᱰᱩᱞᱟᱨ ᱠᱟᱸᱛᱷ ᱛᱮ ᱵᱮᱱᱟᱣ ᱟᱠᱟᱱᱟ, ᱡᱟᱦᱟᱸᱭ ᱨᱮᱱᱟᱜ ᱚᱥᱟᱨ ᱖᱐᱐᱐ ᱢᱤᱢᱤ ᱟᱨ ᱩᱥᱩᱞ ᱗᱐᱐᱐ ᱢᱤᱢᱤ ᱠᱟᱱᱟ ᱾ ᱪᱚᱞᱚᱱ ᱫᱚ ᱒᱐,᱐᱐᱐ ᱥᱴᱮᱯᱟᱨ ᱢᱚᱴᱚᱨ ᱛᱮ ᱵᱮᱱᱟᱣᱚᱜ ᱠᱟᱱᱟ, ᱚᱠᱟ ᱫᱚ ᱢᱤᱫ ᱠᱟᱥᱴᱚᱢ ᱞᱤᱰ ᱥᱠᱨᱩ ᱟᱨ ᱞᱤᱵᱷᱟᱨ ᱥᱤᱥᱴᱚᱢ ᱠᱚ ᱪᱟᱞᱟᱣᱮᱫᱟ ᱟᱨ ᱚᱱᱟ ᱨᱮᱱᱟᱜ ᱴᱷᱤᱠ ᱛᱮᱫ ᱐.᱑ ᱢᱤᱢᱤ ᱠᱟᱱᱟ ᱾ ᱟᱡ ᱛᱮ ᱛᱮᱞ ᱮᱢᱚᱜ ᱴᱮᱠᱱᱚᱯᱚᱞᱤᱢᱟᱨ ᱛᱮ ᱵᱮᱱᱟᱣ ᱡᱤᱱᱤᱥ ᱠᱚ ᱨᱮ ᱛᱮᱞ ᱮᱢ ᱵᱟᱝ ᱞᱟᱹᱠᱛᱤᱭᱟ ᱟᱨ ᱥᱟᱯᱲᱟᱣ ᱞᱟᱹᱜᱤᱫ ᱥᱟᱢᱟᱝ ᱥᱮᱫ ᱠᱷᱚᱱ ᱵᱚᱞᱚ ᱫᱟᱲᱮᱭᱟᱜᱼᱟ ᱾ ᱠᱚᱨᱤᱭᱚᱜᱽᱨᱟᱯᱷ ᱟᱠᱟᱱ ᱥᱤᱠᱣᱮᱱᱥ ᱠᱚ ᱫᱚ ᱜᱽᱨᱮᱥᱠᱮᱞ ᱵᱷᱤᱰᱤᱭᱚ ᱠᱷᱚᱱ ᱠᱚ ᱵᱮᱱᱟᱣᱟ, ᱡᱟᱦᱟᱸᱨᱮ ᱢᱟᱨᱥᱟᱞ ᱨᱮᱱᱟᱜ ᱢᱟᱛᱨᱟ ᱛᱮ ᱪᱚᱞᱚᱱ ᱨᱮᱱᱟᱜ ᱢᱟᱛᱨᱟ ᱠᱚ ᱴᱷᱟᱹᱣᱠᱟᱭᱟ ᱾
ᱢᱟᱱᱟᱱ
A' Design Award ᱨᱩᱯᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱵᱟᱵᱚᱛ ᱛᱮ
Kwsa ᱠᱟᱤᱱᱮᱴᱤᱠ ᱠᱟᱸᱛᱷ ᱫᱚ A' Design Award ᱨᱩᱯᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱧᱟᱢ ᱟᱠᱟᱱᱟ, ᱱᱚᱶᱟ ᱫᱚ ᱥᱩᱱᱫᱚᱨ ᱟᱨ ᱵᱷᱟᱞᱟᱭ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ ᱞᱟᱹᱜᱤᱫ ᱮᱢ ᱟᱠᱟᱱ ᱥᱚᱢᱟᱱ ᱠᱟᱱᱟ᱾ ᱱᱚᱶᱟ ᱠᱚ ᱫᱚ ᱰᱤᱡᱟᱭᱤᱱᱟᱨ ᱠᱚ ᱨᱮᱭᱟᱜ ᱵᱷᱟᱵᱱᱟ ᱟᱨ ᱵᱷᱟᱞᱟᱭ ᱠᱟᱢᱤ ᱡᱷᱟᱞᱠᱟᱣ ᱠᱚ᱾ Kwsa ᱠᱟᱤᱱᱮᱴᱤᱠ ᱠᱟᱸᱛᱷ ᱫᱚ ᱠᱚᱞᱟ, ᱣᱤᱜᱭᱟᱱ, ᱰᱤᱡᱟᱭᱤᱱ ᱟᱨ ᱴᱮᱠᱱᱚᱞᱚᱡᱤ ᱨᱮᱭᱟᱜ ᱥᱤᱢᱟ ᱵᱟᱲᱦᱟᱣ ᱟᱨ ᱫᱩᱱᱤᱭᱟ ᱵᱷᱟᱞᱟᱭ ᱞᱟᱹᱜᱤᱫ ᱜᱚᱲᱚ ᱮᱢ ᱠᱟᱱᱟ᱾
ᱰᱤᱡᱟᱭᱤᱱ ᱯᱤᱪᱷᱟ ᱨᱮ
ᱯᱨᱮᱥ ᱠᱤᱴ
ᱰᱤᱡᱟᱭᱤᱱᱟᱨ ᱧᱮᱞ ᱠᱷᱚᱱ ᱠᱨᱮᱰᱤᱴ, ᱴᱤᱢ ᱥᱫᱚᱥᱭ ᱟᱨ ᱴᱮᱠᱱᱤᱠᱮᱞ ᱵᱤᱵᱚᱨᱚᱬ ᱮᱢ ᱟᱠᱟᱱᱟ᱾
- ᱟᱞᱜᱟ ᱜᱩᱱ ᱠᱚ
- Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
- ᱢᱟᱯ ᱟᱨ ᱯᱮᱠᱮᱡᱤᱝ
- Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required. - ᱴᱮᱜ ᱠᱚ
- Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
- ᱛᱮᱭᱟᱨ ᱛᱮᱠᱱᱚᱞᱚᱡᱤ
- The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
- ᱰᱤᱡᱟᱭᱱ ᱪᱮᱞᱮᱧ
- A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
- ᱜᱚᱵᱮᱥᱚᱱᱟ
- This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
- ᱯᱨᱮᱨᱚᱱᱟ
- The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
- ᱯᱨᱚᱡᱮᱠᱴ ᱥᱚᱢᱚᱭ
- The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024. - ᱠᱟᱹᱢᱤ ᱦᱚᱨ
- The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
- ᱴᱤᱢ ᱥᱮᱫᱟᱭ ᱠᱚ
- Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology
ᱥᱯᱚᱱᱥᱚᱨᱰ
Designers.org ᱠᱷᱚᱱ ᱯᱟᱨᱚᱢ ᱛᱟᱞᱟᱥ
ᱟᱞᱮᱭᱟᱜ ᱵᱤᱜᱽᱭᱟᱯᱚᱱ ᱥᱟᱹᱜᱟᱹᱭ ᱠᱚ ᱠᱷᱚᱱ ᱯᱨᱚᱰᱟᱠᱴ, ᱥᱮᱵᱟ ᱟᱨ ᱢᱚᱠᱟ ᱩᱫᱩᱜ ᱢᱮ᱾
ᱟᱨᱦᱚᱸ ᱠᱷᱚᱡ ᱢᱮ
ᱥᱟᱹᱜᱟᱹᱭ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ
ᱢᱤᱫ ᱞᱮᱠᱟ ᱠᱮᱴᱮᱜᱚᱨᱤ ᱠᱷᱚᱱ ᱟᱨᱦᱚᱸ ᱯᱩᱨᱥᱠᱟᱨ ᱧᱟᱢᱟᱠᱟᱱ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ ᱧᱮᱞ ᱢᱮ, ᱡᱚᱜᱭᱟᱛᱟ ᱧᱮᱞ ᱛᱮ ᱵᱟᱪᱷᱟᱣ ᱟᱠᱟᱱᱟ᱾