Muundo Hangar Renovation Muundo wa Ndani wa Jumba la Makumbusho na Piotr Pyrtek ni mshindi mashuhuri wa tuzo ya kifahari ya 2023 Tuzo ya Chuma ya A' Design Award katika Kategoria ya Mashindano ya Usanifu wa Nafasi za Ndani na Maonyesho.
ChumaMambo ya Ndani· 2023
Hangar Renovation Muundo wa Ndani wa Jumba la Makumbusho
na Piotr Pyrtek
Mteja: Ekotektura
Mshindi wa Tuzo ya Chuma ya A' Design Award katika Kategoria ya Mambo ya Ndani
Mshindi wa Tuzo Aliyethibitishwa
Thibitisha Hali ya Tuzo kwa #149399Muundo
Kuhusu Hangar Renovation Muundo wa Ndani wa Jumba la Makumbusho
Ukarabati wa Hangar ni muundo wa ndani wa makumbusho ulioundwa ndani ya hangar ya kihistoria ya ndege. Makumbusho hii inaonyesha uhandisi na teknolojia, na nafasi hii pia inahudumia matukio na maonyesho. Vipengele vipya vya ndani vinafuata mtindo wa kiviwanda unaohusiana na matumizi asilia ya hangar. Ghorofa ya kati (mezzanine) yenye muundo wa wazi wa mfumo wa matundu imejengwa juu ya sakafu kwa urefu wa mita tatu. Ghorofa hii ya kati imewekwa mbali na kuta za nje ili kuhifadhi jengo asilia. Chuma, matofali, zege, na mbao zimetumika. Majiko ya zamani ya kupashia joto pamoja na usimikaji wake yamerekebishwa na kuonyeshwa kwa wageni.
Utambuzi
Kuhusu Tuzo ya Chuma ya A' Design Award
Hangar Renovation Muundo wa Ndani wa Jumba la Makumbusho ni mshindi wa Tuzo ya Chuma ya A' Design Award, utambuzi wenye heshima unaotolewa kwa miundo mizuri inayokidhi mahitaji ya kitaalamu na ya kiviwanda yanayotarajiwa kutoka kwa kazi zilizobuniwa vizuri. Washindi wa Chuma huonyesha ustadi mkubwa, utaalamu wa hali ya juu, uelewa wa kitaalamu na uwezo wa kibunifu wa waumbaji wao. Hangar Renovation Muundo wa Ndani wa Jumba la Makumbusho inatarajiwa kuwa kazi inayothaminiwa sana, kupendwa na kuenziwa, ambayo ni ya vitendo na bunifu. Muundo huu ulioshinda Tuzo ya Chuma ya A' Design Award unajumuisha mbinu bora za tasnia na una sifa za kiufundi zenye uwezo zilizounganishwa na ujuzi na kipaji. Hangar Renovation Muundo wa Ndani wa Jumba la Makumbusho inaheshimiwa kwa uangalifu wake na imebuniwa kutoa maboresho ya ubora wa maisha yanayosaidia kuufanya ulimwengu kuwa mahali bora zaidi.
Nyuma ya Muundo
Vifaa vya Habari
Mikopo, wanachama wa timu na maelezo ya kiufundi yaliyotolewa na mbuni.
- Sifa za Kipekee
- The very design of the new interior elements has been kept in the industrial convention, which is directly associated with the original function of the Hangar. The designed mezzanine is nothing more than a bridge structure, whose expressive lattice structure catches the eye. Elevated 3m above the ground, the mezzanine was deliberately erected at a certain distance from the building's exterior walls, so as to preserve as much of the building's originality as possible.
- Vipimo na Ufungashaji
- Historic aircraft hangar:
- Designed building area - 2312.39 m2
- Building height - hangar - 10.52m
- Width of the hangar building - 40,64m
- Length of the hangar building - 66,88m
- Number of above-ground floors - 1
- Number of underground floors - hangar - 1
- Volume of the hangar - 21.096 m3
Boiler room:
- Designed building area - 185,88 m2
- Building height - 7.31m
- Building width - 9.50m
- Length of the building - 19.50m
- Number of above-ground floors - 1
- Number of underground floors - 1
- Cubic capacity - 991.6 m3 - Lebo
- Hangar, Hangar Czyżyny, Hangar Kraków, Hangar MiT, Hangar museum
- Teknolojia ya Uzalishaji
- During the design process, we placed great emphasis on period materials, mainly because the project largely involved reconstruction, or reproduction of the original character. Also when creating new elements, we tried to use materials that could have been used almost a century ago - steel, brick, concrete, wood. Even though the design of some of the interior elements seems to be contemporary, the materials used in producing them are definitely classic.
- Changamoto ya Ubunifu
- The most difficult part of the project was combining the historical elements of the hangar with the new elements, which had to be stylistically adapted to each other due to their contemporary nature and technical requirements.
- Utafiti
- The project was preceded by an in-depth architectural study of historical studies of this particular hangar, but also of other hangars from this period. Also, extensive research of the city archives helped to establish the final design guidelines and to proceed with the development of the documentation. All new elements that emerged at the concept stage and later in the construction project resulted directly or indirectly from the research. The entire study was agreed on an ongoing basis with the City Historic Preservation Officer and under his strict protection.
- Msukumo
- The historic aircraft hangar has been converted into a museum of engineering and technology. The interior has been maintained in the chrakter of the era, and the created space will be ideal for both the exposition of automotive objects, but also for the organization of various events and spectacles, as was the case at the last Sacrum Profanum in Krakow.
- Muda wa Mradi
- The project will begin in December 2017 and end in 2019. Construction continued until mid-2022.
Imedhaminiwa
Gundua Zaidi ya Designers.org
Gundua bidhaa, huduma na fursa kutoka kwa washirika wetu wa matangazo.
Zaidi ya Kuchunguza
Miundo Inayohusiana
Chunguza miundo zaidi iliyoshinda tuzo kutoka kategoria hiyo hiyo, iliyochaguliwa kwa ubora.